Trending Questions |
Jamb Physics Past QuestionsJamb Past Questions and Answers on (a) Work, Energy and PowerQuestion 41:If a load of mass 10N stretched a cord by 1.2cm, what is the total work done? A. 6.0 x 10-2J B. 7.6 x 10-2J C. 1.8 x 10-2J D. 6.6 x 10-2J Question 42:A bob of weight 0.1 N hangs from a massless string of length 50 cm. A variable horizontal force which increase from zero is applied to pull the bob until the string makes an angle of 60o with the vertical. The work done is A. 0.500 J B. 0.250 J C. 0.050 J D. 0.025 J Question 43:A carpenter on top of a roof of 20.0m high dropped a hammer of mass 1.5 kg and it fell directly to the ground. the kinetic energy of the hammer just before hitting the ground is?[g = 10 ms-2] A. 600 J B. 150J C. 300 J D. 450 J Question 44:A lead bullet of mass 0.05kg is fired with a velocity of 200ms\(^{-1}\) into a lead block of mass 0.95kg. Given that the lead block can move freely, the final kinetic energy after impact is A. 50 J B. 100 J C. 150 J D. 200 J Question 45:A ball of mass 0.1kg is thrown vertically upwards with a speed of 10ms-1 from the top of a tower 10m high. Neglecting air resistance, its total energy just before hitting the ground is (take g = 10ms-2) A. 5 J B. 10 J C. 15 J D. 20 J |
|
| ||||||
Disclaimer All Views, Names, Acronyms, Trademarks, Expressed on this website are those of their respective owners. Please note that www.schoolngr.com is not affiliated with any of the institutions featured in this website. It is always recommended to visit an institutions or sources official website for more information. In the same vein, all comments placed here do not represent the opinion of schoolngr.com SCHOOLNGR - © 2020 - 2024 - Tayo Hammed | Terms Of Service | Copyright | Privacy Policy |